10-15-2026, 08:13 AM
Driving up I-5 yesterday on my way to campus for Reunion, very sad to see acres and acres of dead and dying orchards. Some being replaced by blue agave--future tequila plantations.
Pax et Bonum
(10-15-2026, 08:13 AM)thunder_chik Wrote: Driving up I-5 yesterday on my way to campus for Reunion, very sad to see acres and acres of dead and dying orchards. Some being replaced by blue agave--future tequila plantations.
(10-15-2026, 08:13 AM)thunder_chik Wrote: Driving up I-5 yesterday on my way to campus for Reunion, very sad to see acres and acres of dead and dying orchards. Some being replaced by blue agave--future tequila plantations.
(10-15-2026, 02:58 PM)BostonCard Wrote:(10-15-2026, 08:13 AM)thunder_chik Wrote: Driving up I-5 yesterday on my way to campus for Reunion, very sad to see acres and acres of dead and dying orchards. Some being replaced by blue agave--future tequila plantations.
Its only tequila if its grown in certain regions in mexico; otherwise its just blue agave distillate.
Sorry this is behind a paywall:
https://www.bloomberg.com/news/features/...dium=email
BC
(10-15-2026, 02:58 PM)BostonCard Wrote:(10-15-2026, 08:13 AM)thunder_chik Wrote: Driving up I-5 yesterday on my way to campus for Reunion, very sad to see acres and acres of dead and dying orchards. Some being replaced by blue agave--future tequila plantations.
Its only tequila if its grown in certain regions in mexico; otherwise its just blue agave distillate.
Sorry this is behind a paywall:
https://www.bloomberg.com/news/features/...dium=email
BC
(11-05-2026, 09:44 AM)Mick Wrote: California’s largest reservoir in 50 years gets final approval, could break ground in June.
Plan for California’s largest reservoir in 50 years wins approval
Sites Reservoir will be situated in the sparsely populated hills in Colusa and Glenn counties, 70 miles NW of Sacto. Current cost is estimated at $6.2 to $6.8 billion. Bay Area will get some of the water. Sacto River water rights was the last right formally remaining. Now all that needs doing is securing financing, acquiring property and planning for litigation. You know...the easy stuff.
Capacity will be 1.5 million acre-feet, enough to supply more than three million households for a year. It would be the 8th largest reservoir in the state (out of 1,500+).
Groundbreaking is expected in June or July, 2027 with a finish date of late 2034.
(11-05-2026, 09:44 AM)Mick Wrote: California’s largest reservoir in 50 years gets final approval, could break ground in June.
Plan for California’s largest reservoir in 50 years wins approval
Sites Reservoir will be situated in the sparsely populated hills in Colusa and Glenn counties, 70 miles NW of Sacto. Current cost is estimated at $6.2 to $6.8 billion. Bay Area will get some of the water. Sacto River water rights was the last right formally remaining. Now all that needs doing is securing financing, acquiring property and planning for litigation. You know...the easy stuff.
Capacity will be 1.5 million acre-feet, enough to supply more than three million households for a year. It would be the 8th largest reservoir in the state (out of 1,500+).
Groundbreaking is expected in June or July, 2027 with a finish date of late 2034.
(11-05-2026, 11:29 AM)82lsju Wrote:I'll venture a guess that the above is overly optimistic :-).(11-05-2026, 09:44 AM)Mick Wrote: California’s largest reservoir in 50 years gets final approval, could break ground in June.
Plan for California’s largest reservoir in 50 years wins approval
Sites Reservoir will be situated in the sparsely populated hills in Colusa and Glenn counties, 70 miles NW of Sacto. Current cost is estimated at $6.2 to $6.8 billion. Bay Area will get some of the water. Sacto River water rights was the last right formally remaining. Now all that needs doing is securing financing, acquiring property and planning for litigation. You know...the easy stuff.
Capacity will be 1.5 million acre-feet, enough to supply more than three million households for a year. It would be the 8th largest reservoir in the state (out of 1,500+).
Groundbreaking is expected in June or July, 2027 with a finish date of late 2034.
I'll venture a guess that it costs at least $8b and is not completed until at least 2037
(11-05-2026, 11:29 AM)82lsju Wrote:I'll venture a guess that the above is overly optimistic :-).(11-05-2026, 09:44 AM)Mick Wrote: California’s largest reservoir in 50 years gets final approval, could break ground in June.
Plan for California’s largest reservoir in 50 years wins approval
Sites Reservoir will be situated in the sparsely populated hills in Colusa and Glenn counties, 70 miles NW of Sacto. Current cost is estimated at $6.2 to $6.8 billion. Bay Area will get some of the water. Sacto River water rights was the last right formally remaining. Now all that needs doing is securing financing, acquiring property and planning for litigation. You know...the easy stuff.
Capacity will be 1.5 million acre-feet, enough to supply more than three million households for a year. It would be the 8th largest reservoir in the state (out of 1,500+).
Groundbreaking is expected in June or July, 2027 with a finish date of late 2034.
I'll venture a guess that it costs at least $8b and is not completed until at least 2037
(11-05-2026, 12:31 PM)Goose Wrote:(11-05-2026, 11:29 AM)82lsju Wrote:I'll venture a guess that the above is overly optimistic :-).(11-05-2026, 09:44 AM)Mick Wrote: California’s largest reservoir in 50 years gets final approval, could break ground in June.
Plan for California’s largest reservoir in 50 years wins approval
Sites Reservoir will be situated in the sparsely populated hills in Colusa and Glenn counties, 70 miles NW of Sacto. Current cost is estimated at $6.2 to $6.8 billion. Bay Area will get some of the water. Sacto River water rights was the last right formally remaining. Now all that needs doing is securing financing, acquiring property and planning for litigation. You know...the easy stuff.
Capacity will be 1.5 million acre-feet, enough to supply more than three million households for a year. It would be the 8th largest reservoir in the state (out of 1,500+).
Groundbreaking is expected in June or July, 2027 with a finish date of late 2034.
I'll venture a guess that it costs at least $8b and is not completed until at least 2037
(11-05-2026, 12:31 PM)Goose Wrote:(11-05-2026, 11:29 AM)82lsju Wrote:I'll venture a guess that the above is overly optimistic :-).(11-05-2026, 09:44 AM)Mick Wrote: California’s largest reservoir in 50 years gets final approval, could break ground in June.
Plan for California’s largest reservoir in 50 years wins approval
Sites Reservoir will be situated in the sparsely populated hills in Colusa and Glenn counties, 70 miles NW of Sacto. Current cost is estimated at $6.2 to $6.8 billion. Bay Area will get some of the water. Sacto River water rights was the last right formally remaining. Now all that needs doing is securing financing, acquiring property and planning for litigation. You know...the easy stuff.
Capacity will be 1.5 million acre-feet, enough to supply more than three million households for a year. It would be the 8th largest reservoir in the state (out of 1,500+).
Groundbreaking is expected in June or July, 2027 with a finish date of late 2034.
I'll venture a guess that it costs at least $8b and is not completed until at least 2037
(11-05-2026, 12:58 PM)82lsju Wrote:I first wrote about this in 2018.(11-05-2026, 12:31 PM)Goose Wrote:(11-05-2026, 11:29 AM)82lsju Wrote:I'll venture a guess that the above is overly optimistic :-).(11-05-2026, 09:44 AM)Mick Wrote: California’s largest reservoir in 50 years gets final approval, could break ground in June.
Plan for California’s largest reservoir in 50 years wins approval
Sites Reservoir will be situated in the sparsely populated hills in Colusa and Glenn counties, 70 miles NW of Sacto. Current cost is estimated at $6.2 to $6.8 billion. Bay Area will get some of the water. Sacto River water rights was the last right formally remaining. Now all that needs doing is securing financing, acquiring property and planning for litigation. You know...the easy stuff.
Capacity will be 1.5 million acre-feet, enough to supply more than three million households for a year. It would be the 8th largest reservoir in the state (out of 1,500+).
Groundbreaking is expected in June or July, 2027 with a finish date of late 2034.
I'll venture a guess that it costs at least $8b and is not completed until at least 2037
well I was originally going to go with over $10b and after 2040 but did not want to be overly pessimistic
(11-05-2026, 12:58 PM)82lsju Wrote:I first wrote about this in 2018.(11-05-2026, 12:31 PM)Goose Wrote:(11-05-2026, 11:29 AM)82lsju Wrote:I'll venture a guess that the above is overly optimistic :-).(11-05-2026, 09:44 AM)Mick Wrote: California’s largest reservoir in 50 years gets final approval, could break ground in June.
Plan for California’s largest reservoir in 50 years wins approval
Sites Reservoir will be situated in the sparsely populated hills in Colusa and Glenn counties, 70 miles NW of Sacto. Current cost is estimated at $6.2 to $6.8 billion. Bay Area will get some of the water. Sacto River water rights was the last right formally remaining. Now all that needs doing is securing financing, acquiring property and planning for litigation. You know...the easy stuff.
Capacity will be 1.5 million acre-feet, enough to supply more than three million households for a year. It would be the 8th largest reservoir in the state (out of 1,500+).
Groundbreaking is expected in June or July, 2027 with a finish date of late 2034.
I'll venture a guess that it costs at least $8b and is not completed until at least 2037
well I was originally going to go with over $10b and after 2040 but did not want to be overly pessimistic
(11-05-2026, 04:56 PM)TonyLima Wrote:(11-05-2026, 12:58 PM)82lsju Wrote:I first wrote about this in 2018.(11-05-2026, 12:31 PM)Goose Wrote:(11-05-2026, 11:29 AM)82lsju Wrote:I'll venture a guess that the above is overly optimistic :-).(11-05-2026, 09:44 AM)Mick Wrote: California’s largest reservoir in 50 years gets final approval, could break ground in June.
Plan for California’s largest reservoir in 50 years wins approval
Sites Reservoir will be situated in the sparsely populated hills in Colusa and Glenn counties, 70 miles NW of Sacto. Current cost is estimated at $6.2 to $6.8 billion. Bay Area will get some of the water. Sacto River water rights was the last right formally remaining. Now all that needs doing is securing financing, acquiring property and planning for litigation. You know...the easy stuff.
Capacity will be 1.5 million acre-feet, enough to supply more than three million households for a year. It would be the 8th largest reservoir in the state (out of 1,500+).
Groundbreaking is expected in June or July, 2027 with a finish date of late 2034.
I'll venture a guess that it costs at least $8b and is not completed until at least 2037
well I was originally going to go with over $10b and after 2040 but did not want to be overly pessimistic
(11-05-2026, 04:56 PM)TonyLima Wrote:(11-05-2026, 12:58 PM)82lsju Wrote:I first wrote about this in 2018.(11-05-2026, 12:31 PM)Goose Wrote:(11-05-2026, 11:29 AM)82lsju Wrote:I'll venture a guess that the above is overly optimistic :-).(11-05-2026, 09:44 AM)Mick Wrote: California’s largest reservoir in 50 years gets final approval, could break ground in June.
Plan for California’s largest reservoir in 50 years wins approval
Sites Reservoir will be situated in the sparsely populated hills in Colusa and Glenn counties, 70 miles NW of Sacto. Current cost is estimated at $6.2 to $6.8 billion. Bay Area will get some of the water. Sacto River water rights was the last right formally remaining. Now all that needs doing is securing financing, acquiring property and planning for litigation. You know...the easy stuff.
Capacity will be 1.5 million acre-feet, enough to supply more than three million households for a year. It would be the 8th largest reservoir in the state (out of 1,500+).
Groundbreaking is expected in June or July, 2027 with a finish date of late 2034.
I'll venture a guess that it costs at least $8b and is not completed until at least 2037
well I was originally going to go with over $10b and after 2040 but did not want to be overly pessimistic
(11-05-2026, 05:09 PM)Mick Wrote:Thanks. There are several more. Go to the home page and check out California Compendium.(11-05-2026, 04:56 PM)TonyLima Wrote:(11-05-2026, 12:58 PM)82lsju Wrote:I first wrote about this in 2018.(11-05-2026, 12:31 PM)Goose Wrote:(11-05-2026, 11:29 AM)82lsju Wrote: I'll venture a guess that it costs at least $8b and is not completed until at least 2037I'll venture a guess that the above is overly optimistic :-).
well I was originally going to go with over $10b and after 2040 but did not want to be overly pessimistic
Great article. Scary, in its own way.
(11-05-2026, 05:09 PM)Mick Wrote:Thanks. There are several more. Go to the home page and check out California Compendium.(11-05-2026, 04:56 PM)TonyLima Wrote:(11-05-2026, 12:58 PM)82lsju Wrote:I first wrote about this in 2018.(11-05-2026, 12:31 PM)Goose Wrote:(11-05-2026, 11:29 AM)82lsju Wrote: I'll venture a guess that it costs at least $8b and is not completed until at least 2037I'll venture a guess that the above is overly optimistic :-).
well I was originally going to go with over $10b and after 2040 but did not want to be overly pessimistic
Great article. Scary, in its own way.
Quote:Lake Powell, the second-largest reservoir in the U.S., rose more than 20 feet (6.1 meters) from its mid-September low — dwarfing its gains from this year’s snowmelt, Hoerling said. Still, the lake remained just over a quarter full, and 15 of its 17 boat launches remained unusable as of Friday.
The floodwaters and additional rain could raise the lake along the Arizona-Utah border further, for a total of over 1.2 million acre-feet — enough to support around 4 million average families for a year, Hoerling estimated.
Quote:The El Niño system that has formed is causing serious consternation among weather news followers, who now have to read all the way to the end of a long sentence to determine whether or not they should be happy about a particular ramification of El Niño. Take the shocking news this past week, where the chaotic climate phenomenon (BAD) brought moisture to the arid Southwest (GOOD?) in the form of torrential storms (BAD?) that revived small or dry creeks (GOOD?) to the point of overflowing and flooding in many local communities (BAD??), replenishing depleted aquifers (GOOD??) when it wasn’t forcing evacuations and cutting off access to many areas (BAD???), with the ultimate effect of raising Lake Powell by more than 20 feet from its mid-September low (GOOD!). Even if the reservoir remains a quarter full (BAD!), additional rain could raise the lake by 1.2 million acre-feet (GOOD!). El Niño is expected to last several more months (???).
Quote:Lake Powell, the second-largest reservoir in the U.S., rose more than 20 feet (6.1 meters) from its mid-September low — dwarfing its gains from this year’s snowmelt, Hoerling said. Still, the lake remained just over a quarter full, and 15 of its 17 boat launches remained unusable as of Friday.
The floodwaters and additional rain could raise the lake along the Arizona-Utah border further, for a total of over 1.2 million acre-feet — enough to support around 4 million average families for a year, Hoerling estimated.
Quote:The El Niño system that has formed is causing serious consternation among weather news followers, who now have to read all the way to the end of a long sentence to determine whether or not they should be happy about a particular ramification of El Niño. Take the shocking news this past week, where the chaotic climate phenomenon (BAD) brought moisture to the arid Southwest (GOOD?) in the form of torrential storms (BAD?) that revived small or dry creeks (GOOD?) to the point of overflowing and flooding in many local communities (BAD??), replenishing depleted aquifers (GOOD??) when it wasn’t forcing evacuations and cutting off access to many areas (BAD???), with the ultimate effect of raising Lake Powell by more than 20 feet from its mid-September low (GOOD!). Even if the reservoir remains a quarter full (BAD!), additional rain could raise the lake by 1.2 million acre-feet (GOOD!). El Niño is expected to last several more months (???).
(11-11-2026, 03:21 PM)Mick Wrote: So, will El Niño be good or bad?
YES.
(11-11-2026, 03:21 PM)Mick Wrote: So, will El Niño be good or bad?
YES.